Exterior renovation and interior completion of a Classic 1960s modern building,which had been gutted back to a shell state. A three-story addition was added to the rear that connects all three floors by a common stair and a elevator for ADA accessibility. An air lock was created by pulling the 2 story lobby façade out, also allowing natural light to stream in the use of red mullions commands a strong street presence.
With 1960’s retrospect in mind a color palette of warm, rich hues of brown, red and orange welcomes visitors, while the reception desk brings a modern feel with the mixture of perforated wood, 3 form decorative resin and stainless steel. A brighter color palette was utilized in the basement providing a working environment that feels like anything but a basement. Employees enjoy a break area on the lower level for informal collaboration meetings. Amenities such as showers and a work-out room were provided.